
Technical Blog
One-stop precision sheet metal manufacturing
Short, specific notes from the shop floor — one decision per entry, written for the engineer who has to put that decision on a drawing. Each piece links to the capability or product page that carries the full explanation.

Notes from the shop floor
Short, specific write-ups on the decisions that actually move cost, tolerance and lead time on a sheet metal programme.












Frequently asked questions
What is the minimum order quantity?
There is no fixed MOQ. Prototypes and small batches from one piece are accepted, and unit prices fall as volume grows. One-off tooling cost is quoted separately.
Can you work from our drawings and keep them confidential?
Yes. We regularly work under NDA and produce strictly to customer drawings. Files stay on an internal server and are never shared with third parties.
How long does production take after the sample is approved?
A first-article sample is typically ready in 7–10 working days, and series production runs in 3–5 weeks depending on quantity and surface finish.
Send your drawings and quantity — an engineer, not a sales script, comes back with a quotation covering material, tooling, surface finish and lead time.
Send your drawings and quantity — you will get a quotation with lead time, not a sales script.
